What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Kirkintilloch?
In Kirkintilloch, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Prices in Scotland sit near the national average for this kind of work, and the range for Kirkintilloch reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £26,000–£36,500 |
| Typical project (16 m²) | £37,500–£53,000 |
| Larger project (22 m²) | £51,500–£72,500 |
| Rate per m² | £2,350–£3,300 |
The biggest cost drivers are:
- Lantern size
- Amount and type of glazing
- Opening into the house
- Frame material and colour
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for an orangery in Kirkintilloch?
Before anything is built in Kirkintilloch, we confirm which approvals apply in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Electrics, heating and plastering
- Flooring and decoration options
- French, sliding or bifold doors
- Roof lantern and glazed panels
- Building control sign-off where required
- Foundations and dwarf walls or piers
How long does it take?
Allow 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Kirkintilloch
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Projects in Kirkintilloch (G66) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Kirkintilloch
How much does an orangery cost in Kirkintilloch?
In Kirkintilloch, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for an orangery in Kirkintilloch?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Who approves an orangery in Kirkintilloch?
Planning matters in Kirkintilloch go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
