What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Lancashire?
In Lancashire, an orangery typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £36,000–£51,000. That range is adjusted for the North West, where domestic building work typically costs around 6% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £25,000–£35,000 |
| Typical project (16 m²) | £36,000–£51,000 |
| Larger project (22 m²) | £49,500–£70,500 |
| Rate per m² | £2,250–£3,200 |
The biggest cost drivers are:
- Size and shape of the footprint
- Lantern size
- Heating and flooring
- Opening into the house
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Lancashire?
Before anything is built in Lancashire, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most orangeries:
- French, sliding or bifold doors
- Building control sign-off where required
- Flooring and decoration options
- Design to suit the style of the house
- Roof lantern and glazed panels
- Insulated perimeter roof with internal pelmet
How long does it take?
Expect 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Lancashire
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Towns we cover in Lancashire include Preston, Burnley, Blackburn, Blackpool, Fylde and Rossendale.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Lancashire
How much does an orangery cost in Lancashire?
In Lancashire, an orangery typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £36,000–£51,000. Your fixed price depends on the survey and drawings.
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
Who approves an orangery in Lancashire?
Planning matters in Lancashire go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
