What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Teddington?
In Teddington, an orangery typically costs £3,100–£4,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £49,500–£70,500. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £34,000–£48,500 |
| Typical project (16 m²) | £49,500–£70,500 |
| Larger project (22 m²) | £68,000–£97,000 |
| Rate per m² | £3,100–£4,400 |
The main things that change the cost:
- Heating and flooring
- Frame material and colour
- Size and shape of the footprint
- Lantern size
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Teddington?
Here is how the rules work for an orangery in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Foundations and dwarf walls or piers
- Flooring and decoration options
- Design to suit the style of the house
- Building control sign-off where required
- Electrics, heating and plastering
- French, sliding or bifold doors
How long does it take?
The build itself usually takes 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Teddington
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
From TW11 outwards, we take on projects throughout Teddington and the surrounding parts of Greater London.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Teddington
How much does an orangery cost in Teddington?
In Teddington, an orangery typically costs £3,100–£4,400 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £49,500–£70,500. Your fixed price depends on the survey and drawings.
Does an orangery need planning permission?
The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
How long does an orangery take in Teddington?
Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
