What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Abingdon?
In Abingdon, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,750 |
| Larger or more complex projects | £2,750–£3,500 |
The biggest cost drivers are:
- Planning conditions
- Type of application
- Building control route
- Party wall surveyor appointments
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Planning and building regulations in Abingdon
Whether you need planning permission depends on your house and its location in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Lawful development certificate applications
- Prior approval (larger home extension) in England
- Planning or householder applications
- Build-over agreements with the water company
- Building control application and inspections
- Party wall notices
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Abingdon
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Abingdon sits in Oxfordshire, about 6 miles south of Oxford. We cover the whole of Abingdon, including postcodes OX14.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Abingdon
How much does a planning or building regulations application cost in Abingdon?
In Abingdon, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
Do you handle planning and building regulations applications in Abingdon?
Yes. We handle planning and building regulations applications across Abingdon, including postcodes OX14. Every project starts with a free home visit.
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.