What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Bicester?
In Bicester, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,750 |
| Larger or more complex projects | £2,750–£3,500 |
Your quote will depend mainly on:
- Council fees
- Party wall surveyor appointments
- Revisions requested by the council
- Building control route
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Planning and building regulations in Bicester
Whether you need planning permission depends on your house and its location in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a planning or building regulations application:
- Planning or householder applications
- Discharge of planning conditions
- Build-over agreements with the water company
- Lawful development certificate applications
- Building control application and inspections
- Prior approval (larger home extension) in England
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Bicester
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
If your home is in Bicester or close by in Oxford, Banbury and Aylesbury, a free home visit is the first step.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Bicester
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
Do you handle planning and building regulations applications in Bicester?
Yes. We handle planning and building regulations applications across Bicester, including postcodes OX6, OX25, OX26 and OX27. Every project starts with a free home visit.
How much does a planning or building regulations application cost in Bicester?
In Bicester, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.