What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Banstead?
In Banstead, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,750 |
| Larger or more complex projects | £2,750–£3,500 |
What moves the price most:
- Planning conditions
- Type of application
- Council fees
- Building control route
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Banstead
The approval route for Banstead is set by planning law in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Build-over agreements with the water company
- Lawful development certificate applications
- Party wall notices
- Planning or householder applications
- Discharge of planning conditions
- Building control application and inspections
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Banstead
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Our Banstead coverage includes postcode districts SM7, and we also work in nearby places such as Ewell, Epsom and Coulsdon.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Banstead
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
How much does a planning or building regulations application cost in Banstead?
In Banstead, a planning or building regulations application typically costs £750–£2,750 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Do you handle planning and building regulations applications in Banstead?
Yes. We handle planning and building regulations applications across Banstead, including postcodes SM7. Every project starts with a free home visit.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.