What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Bridgwater?
In Bridgwater, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices in the South West sit near the national average for this kind of work, and the range for Bridgwater reflects that. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,500 |
| Larger or more complex projects | £2,500–£3,000 |
The main things that change the cost:
- Type of application
- Party wall surveyor appointments
- Building control route
- Revisions requested by the council
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Bridgwater
Approvals for a planning or building regulations application in Bridgwater follow the rules for England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Permitted development assessment
- Build-over agreements with the water company
- Building control application and inspections
- Lawful development certificate applications
- Discharge of planning conditions
- Party wall notices
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Bridgwater
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Bridgwater sits in Somerset, about 9 miles north-east of Taunton. We cover the whole of Bridgwater, including postcodes TA6.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Bridgwater
Do you handle planning and building regulations applications in Bridgwater?
Yes. We handle planning and building regulations applications across Bridgwater, including postcodes TA6. Every project starts with a free home visit.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
How much does a planning or building regulations application cost in Bridgwater?
In Bridgwater, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.