What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Yeovil?
In Yeovil, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices in the South West sit near the national average for this kind of work, and the range for Yeovil reflects that. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,500 |
| Larger or more complex projects | £2,500–£3,000 |
Your quote will depend mainly on:
- Party wall surveyor appointments
- Revisions requested by the council
- Council fees
- Planning conditions
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Yeovil
The approval route for Yeovil is set by planning law in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most planning and building regulations applications:
- Planning or householder applications
- Prior approval (larger home extension) in England
- Building control application and inspections
- Permitted development assessment
- Party wall notices
- Lawful development certificate applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Yeovil
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Yeovil sits in Somerset, about 21 miles east of Taunton. We cover the whole of Yeovil, including postcodes BA20.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Yeovil
How much does a planning or building regulations application cost in Yeovil?
In Yeovil, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Who carries out building control?
Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
Do you handle planning and building regulations applications in Yeovil?
Yes. We handle planning and building regulations applications across Yeovil, including postcodes BA20. Every project starts with a free home visit.