What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Clwyd?
In Clwyd, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). That range is adjusted for Wales, where domestic building work typically costs around 8% below the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
The main things that change the cost:
- Building control route
- Type of application
- Revisions requested by the council
- Planning conditions
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Planning and building regulations in Clwyd
Here is how the rules work for a planning or building regulations application in Wales. In Wales applications go to the local planning authority, and building control can be the council or a registered building control approver.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most planning and building regulations applications:
- Discharge of planning conditions
- Lawful development certificate applications
- Building control application and inspections
- Planning or householder applications
- Permitted development assessment
- Build-over agreements with the water company
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Clwyd
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Towns we cover in Clwyd include Wrexham, Deeside, Colwyn Bay, Flint, Rhyl and Hawarden.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Clwyd
Do you handle planning and building regulations applications in Clwyd?
Yes. We handle planning and building regulations applications across Clwyd, including postcodes CH1, CH4, CH5, CH6 and CH7. Every project starts with a free home visit.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
How much does a planning or building regulations application cost in Clwyd?
In Clwyd, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.