What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Hawarden?
In Hawarden, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). The guide for Hawarden reflects typical costs in Wales, roughly 8% below the UK-wide figure. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
The main things that change the cost:
- Building control route
- Planning conditions
- Revisions requested by the council
- Party wall surveyor appointments
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Hawarden
Here is how the rules work for a planning or building regulations application in Wales. In Wales applications go to the local planning authority, and building control can be the council or a registered building control approver.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most planning and building regulations applications:
- Build-over agreements with the water company
- Planning or householder applications
- Permitted development assessment
- Party wall notices
- Lawful development certificate applications
- Discharge of planning conditions
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Hawarden
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
From CH5 outwards, we take on projects throughout Hawarden and the surrounding parts of Clwyd.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Hawarden
Do you handle planning and building regulations applications in Hawarden?
Yes. We handle planning and building regulations applications across Hawarden, including postcodes CH5. Every project starts with a free home visit.
How much does a planning or building regulations application cost in Hawarden?
In Hawarden, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.