What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Golders Green?
In Golders Green, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £1,000–£3,250 |
| Larger or more complex projects | £3,250–£4,000 |
What moves the price most:
- Revisions requested by the council
- Building control route
- Planning conditions
- Party wall surveyor appointments
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Planning and building regulations in Golders Green
Approvals for a planning or building regulations application in Golders Green follow the rules for England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Party wall notices
- Prior approval (larger home extension) in England
- Permitted development assessment
- Discharge of planning conditions
- Building control application and inspections
- Build-over agreements with the water company
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Golders Green
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
From NW11 outwards, we take on projects throughout Golders Green and the surrounding parts of Greater London.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Golders Green
Do you handle planning and building regulations applications in Golders Green?
Yes. We handle planning and building regulations applications across Golders Green, including postcodes NW11. Every project starts with a free home visit.
Who carries out building control?
Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.
How much does a planning or building regulations application cost in Golders Green?
In Golders Green, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
