Planning and building regulations in Hayes

From the first sketch to approval, we look after planning and building regulations applications for projects in Hayes and the surrounding parts of Greater London.

Guide price in Hayes

£1,000–£3,250 for application management (council fees extra)

In Hayes, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a planning or building regulations application?

Surveyor measuring the rear of a brick semi-detached house with a laser measure

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.

How much does a planning or building regulations application cost in Hayes?

In Hayes, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Building costs in London run about 30% above the UK average, and the figures for Hayes are adjusted to reflect that. Council application fees are extra.

Guide prices for Hayes, including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT)
Size or typeGuide range
Application management (council fees extra)£1,000–£3,250
Larger or more complex projects£3,250–£4,000

The biggest cost drivers are:

  • Revisions requested by the council
  • Planning conditions
  • Type of application
  • Building control route

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Planning and building regulations in Hayes

Here is how the rules work for a planning or building regulations application in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

Handled as part of most planning and building regulations applications:

  • Build-over agreements with the water company
  • Prior approval (larger home extension) in England
  • Planning or householder applications
  • Permitted development assessment
  • Discharge of planning conditions
  • Party wall notices

How long does it take?

Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Hayes

Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.

If your home is in Hayes or close by in Richmond, Chiswick and Barnes, a free home visit is the first step.

How it works

  1. 01

    Measured survey

    We visit and measure the house so the drawings start from accurate information.

  2. 02

    Concept design

    Options for layout and appearance, revised until you are happy.

  3. 03

    Drawings and documents

    The drawings and forms the council and building control need.

  4. 04

    Submission and follow-up

    We submit the application and deal with questions from the council or building control.

Questions about planning and building regulations applications in Hayes

Do you handle planning and building regulations applications in Hayes?

Yes. We handle planning and building regulations applications across Hayes, including postcodes TW8 and TW9. Every project starts with a free home visit.

Do I need a party wall agreement?

In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.

How long does a planning decision take?

Councils aim to decide most householder applications within 8 weeks.

How much does a planning or building regulations application cost in Hayes?

In Hayes, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.

What is a lawful development certificate?

A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.

Start with a guide price, then book a free survey for a fixed quote in Hayes.

Call 0800 088 6248 or get an instant guide price online.