What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Hazel Grove?
In Hazel Grove, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Building costs in the North West run about 6% below the UK average, and the figures for Hazel Grove are adjusted to reflect that. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
The main things that change the cost:
- Building control route
- Planning conditions
- Revisions requested by the council
- Party wall surveyor appointments
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Hazel Grove
Before anything is built in Hazel Grove, we confirm which approvals apply in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most planning and building regulations applications:
- Party wall notices
- Building control application and inspections
- Lawful development certificate applications
- Build-over agreements with the water company
- Prior approval (larger home extension) in England
- Discharge of planning conditions
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Hazel Grove
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Our Hazel Grove coverage includes postcode districts SK7, and we also work in nearby places such as Stockport, Cheadle Hulme and Hyde.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Hazel Grove
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
How much does a planning or building regulations application cost in Hazel Grove?
In Hazel Grove, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Do you handle planning and building regulations applications in Hazel Grove?
Yes. We handle planning and building regulations applications across Hazel Grove, including postcodes SK7. Every project starts with a free home visit.
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.
