What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Stockport?
In Stockport, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). The guide for Stockport reflects typical costs in the North West, roughly 6% below the UK-wide figure. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
The main things that change the cost:
- Planning conditions
- Council fees
- Building control route
- Revisions requested by the council
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Planning and building regulations in Stockport
Here is how the rules work for a planning or building regulations application in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Lawful development certificate applications
- Party wall notices
- Building control application and inspections
- Planning or householder applications
- Prior approval (larger home extension) in England
- Permitted development assessment
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Stockport
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Stockport sits in Greater Manchester, about 6 miles south-east of Manchester. We cover the whole of Stockport, including postcodes SK1 and SK3.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Stockport
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
Do you handle planning and building regulations applications in Stockport?
Yes. We handle planning and building regulations applications across Stockport, including postcodes SK1 and SK3. Every project starts with a free home visit.
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.
How much does a planning or building regulations application cost in Stockport?
In Stockport, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.