What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Tyldesley?
In Tyldesley, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Tyldesley. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
Your quote will depend mainly on:
- Type of application
- Council fees
- Revisions requested by the council
- Building control route
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Planning and building regulations in Tyldesley
Whether you need planning permission depends on your house and its location in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Lawful development certificate applications
- Build-over agreements with the water company
- Prior approval (larger home extension) in England
- Party wall notices
- Planning or householder applications
- Discharge of planning conditions
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Tyldesley
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Projects in Tyldesley (M29) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Tyldesley
How much does a planning or building regulations application cost in Tyldesley?
In Tyldesley, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Do you handle planning and building regulations applications in Tyldesley?
Yes. We handle planning and building regulations applications across Tyldesley, including postcodes M29. Every project starts with a free home visit.
Who carries out building control?
Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.