What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Llandrindod Wells?
In Llandrindod Wells, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
The main things that change the cost:
- Planning conditions
- Council fees
- Revisions requested by the council
- Party wall surveyor appointments
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Planning and building regulations in Llandrindod Wells
Before anything is built in Llandrindod Wells, we confirm which approvals apply in Wales. In Wales applications go to the local planning authority, and building control can be the council or a registered building control approver.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Build-over agreements with the water company
- Building control application and inspections
- Party wall notices
- Planning or householder applications
- Permitted development assessment
- Lawful development certificate applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Llandrindod Wells
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
We work across Llandrindod Wells and neighbouring areas such as Newtown, Brecon and Welshpool. Postcodes we cover in Llandrindod Wells include LD1.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Llandrindod Wells
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
Do you handle planning and building regulations applications in Llandrindod Wells?
Yes. We handle planning and building regulations applications across Llandrindod Wells, including postcodes LD1. Every project starts with a free home visit.
How much does a planning or building regulations application cost in Llandrindod Wells?
In Llandrindod Wells, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
