What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Newtown?
In Newtown, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Building costs in Wales run about 8% below the UK average, and the figures for Newtown are adjusted to reflect that. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
Your quote will depend mainly on:
- Party wall surveyor appointments
- Revisions requested by the council
- Type of application
- Planning conditions
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Newtown
The approval route for Newtown is set by planning law in Wales. In Wales applications go to the local planning authority, and building control can be the council or a registered building control approver.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical planning or building regulations application we handle:
- Building control application and inspections
- Permitted development assessment
- Lawful development certificate applications
- Build-over agreements with the water company
- Discharge of planning conditions
- Planning or householder applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Newtown
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Our Newtown coverage includes postcode districts SY16, and we also work in nearby places such as Welshpool, Llandrindod Wells and Aberystwyth.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Newtown
Do you handle planning and building regulations applications in Newtown?
Yes. We handle planning and building regulations applications across Newtown, including postcodes SY16. Every project starts with a free home visit.
How much does a planning or building regulations application cost in Newtown?
In Newtown, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.