What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Wigston Magna?
In Wigston Magna, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). The guide for Wigston Magna reflects typical costs in the East Midlands, roughly 5% below the UK-wide figure. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,500 |
| Larger or more complex projects | £2,500–£3,000 |
The main things that change the cost:
- Revisions requested by the council
- Type of application
- Planning conditions
- Party wall surveyor appointments
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Planning and building regulations in Wigston Magna
Approvals for a planning or building regulations application in Wigston Magna follow the rules for England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical planning or building regulations application we handle:
- Building control application and inspections
- Build-over agreements with the water company
- Party wall notices
- Lawful development certificate applications
- Discharge of planning conditions
- Planning or householder applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Wigston Magna
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
Projects in Wigston Magna (LE2 and LE18) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about planning and building regulations applications in Wigston Magna
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
How much does a planning or building regulations application cost in Wigston Magna?
In Wigston Magna, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Do you handle planning and building regulations applications in Wigston Magna?
Yes. We handle planning and building regulations applications across Wigston Magna, including postcodes LE2 and LE18. Every project starts with a free home visit.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
