What is a rooflight loft conversion?

A rooflight loft conversion (sometimes called a roof window conversion) keeps the existing roof shape and adds roof windows that sit flush with the slope. The floor is strengthened, a staircase is added and the space is insulated and finished.
How much does a rooflight loft conversion cost in Heywood?
In Heywood, a rooflight loft conversion typically costs £28,000–£42,500 for a typical rooflight conversion, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the North West, where labour and materials are typically about 6% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rooflight conversion | £28,000–£42,500 |
| Higher specification | £42,500–£53,000 |
Your quote will depend mainly on:
- Fire safety upgrades
- Bathroom or not
- Storage and finishes
- Number of roof windows
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a rooflight loft conversion in Heywood?
The approval route for Heywood is set by planning law in England. In England roof windows are permitted development if they project no more than 15 centimetres from the roof slope and side-facing windows are obscure-glazed. Listed buildings need consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a rooflight loft conversion:
- Roof windows installed
- Staircase and fire-safe escape route
- Drawings and structural calculations
- Insulation between and under rafters
- Head-height survey
- Electrics, heating and plastering
How long does it take?
Expect 4 to 6 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Heywood
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
If your home is in Heywood or close by in Middleton, Rochdale and Bury, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about rooflight loft conversions in Heywood
Is it cheaper than a dormer?
Yes, usually, because the roof shape stays the same. But you gain less full-height floor space.
How much does a rooflight loft conversion cost in Heywood?
In Heywood, a rooflight loft conversion typically costs £28,000–£42,500 for a typical rooflight conversion, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
What about fire safety?
The same escape rules apply as for any loft conversion, so a protected stairway and smoke alarms are typically needed.
Who approves a rooflight loft conversion in Heywood?
Planning matters in Heywood go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take?
Usually 4 to 6 weeks on site.