What is a rooflight loft conversion?

A rooflight loft conversion (sometimes called a roof window conversion) keeps the existing roof shape and adds roof windows that sit flush with the slope. The floor is strengthened, a staircase is added and the space is insulated and finished.
How much does a rooflight loft conversion cost in Greater Manchester?
In Greater Manchester, a rooflight loft conversion typically costs £28,000–£42,500 for a typical rooflight conversion, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the North West, where labour and materials are typically about 6% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical rooflight conversion | £28,000–£42,500 |
| Higher specification | £42,500–£53,000 |
The biggest cost drivers are:
- Staircase position
- Fire safety upgrades
- Number of roof windows
- Storage and finishes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a rooflight loft conversion in Greater Manchester?
Before anything is built in Greater Manchester, we confirm which approvals apply in England. In England roof windows are permitted development if they project no more than 15 centimetres from the roof slope and side-facing windows are obscure-glazed. Listed buildings need consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most rooflight loft conversions:
- Insulation between and under rafters
- Staircase and fire-safe escape route
- Building control sign-off
- Electrics, heating and plastering
- Head-height survey
- Floor joists and any steel beams
How long does it take?
Allow 4 to 6 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Greater Manchester
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Towns we cover in Greater Manchester include Manchester, Oldham, Wigan, Bolton, Stockport and Salford.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about rooflight loft conversions in Greater Manchester
How long does a rooflight loft conversion take in Greater Manchester?
Typically 4 to 6 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
How much head height do I need?
Around 2.2 metres or more from the top of the ceiling joists to the ridge is a good starting point. Insulation and new floor joists reduce the height.
How much does a rooflight loft conversion cost in Greater Manchester?
In Greater Manchester, a rooflight loft conversion typically costs £28,000–£42,500 for a typical rooflight conversion, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Is it cheaper than a dormer?
Yes, usually, because the roof shape stays the same. But you gain less full-height floor space.
Does a rooflight loft conversion need planning permission?
Usually not. In England roof windows are permitted development if they project no more than 15 centimetres from the roof slope, sit no higher than the ridge and any side-facing windows are obscure-glazed. Listed buildings and houses whose rights have been removed need consent. Building regulations approval is always needed.
