What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Armagh?
In Armagh, a side extension typically costs £1,450–£2,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £40,500–£64,500. Prices across Northern Ireland are typically 14% below the UK average for this kind of work, which is reflected in the range for Armagh. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £29,000–£46,000 |
| Typical project (28 m²) | £40,500–£64,500 |
| Larger project (39 m²) | £56,500–£89,500 |
| Rate per m² | £1,450–£2,300 |
The main things that change the cost:
- Single or two storeys
- Internal fit-out of the new rooms
- Drains, gas meters or soil pipes that need moving
- Steel work where the side wall is opened
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Armagh?
Before anything is built in Armagh, we confirm which approvals apply in Northern Ireland. In Northern Ireland a single-storey side extension can be permitted development if it is no more than 4 metres high, no wider than half the original house and not beside a wall facing a road. Side extensions of more than one storey need planning permission.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a side extension:
- Structural calculations
- Electrics, heating and plastering
- Survey of the boundary, drains and access
- Opening into the existing house
- Building control completion
- Walls, roof and windows to match the house
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Armagh
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
Armagh sits in County Armagh. We cover the whole of Armagh, including postcodes BT60 and BT61.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Armagh
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
Do I need planning permission for a side extension in Armagh?
In Northern Ireland a single-storey side extension can be permitted development if it is no more than 4 metres high, no wider than half the original house and not beside a wall facing a road. Side extensions of more than one storey need planning permission.
How much does a side extension cost in Armagh?
In Armagh, a side extension typically costs £1,450–£2,300 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £40,500–£64,500. Your fixed price depends on the survey and drawings.
Do you build side extensions in Armagh?
Yes. We build side extensions across Armagh, including postcodes BT60 and BT61. Every project starts with a free home visit.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.