What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Birkenhead?
In Birkenhead, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£70,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Birkenhead. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £32,000–£50,000 |
| Typical project (28 m²) | £45,000–£70,000 |
| Larger project (39 m²) | £62,500–£97,500 |
| Rate per m² | £1,600–£2,500 |
Your quote will depend mainly on:
- Internal fit-out of the new rooms
- Drains, gas meters or soil pipes that need moving
- Single or two storeys
- Steel work where the side wall is opened
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Birkenhead?
Approvals for a side extension in Birkenhead follow the rules for England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most side extensions:
- Building control completion
- Survey of the boundary, drains and access
- Opening into the existing house
- Planning drawings and application
- Structural calculations
- Electrics, heating and plastering
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Birkenhead
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
From CH41 outwards, we take on projects throughout Birkenhead and the surrounding parts of Merseyside.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Birkenhead
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
Who approves a side extension in Birkenhead?
Planning matters in Birkenhead go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How much does a side extension cost in Birkenhead?
In Birkenhead, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£70,000. Your fixed price depends on the survey and drawings.