What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Borehamwood?
In Borehamwood, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £50,500–£78,500. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £36,000–£56,000 |
| Typical project (28 m²) | £50,500–£78,500 |
| Larger project (39 m²) | £70,000–£109,000 |
| Rate per m² | £1,800–£2,800 |
Your quote will depend mainly on:
- Steel work where the side wall is opened
- Internal fit-out of the new rooms
- Roof design and tile matching
- Single or two storeys
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side extension in Borehamwood?
Before anything is built in Borehamwood, we confirm which approvals apply in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a side extension:
- Survey of the boundary, drains and access
- Building control completion
- Opening into the existing house
- Structural calculations
- Planning drawings and application
- Walls, roof and windows to match the house
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Borehamwood
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
Projects in Borehamwood (WD6) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Borehamwood
Do you build side extensions in Borehamwood?
Yes. We build side extensions across Borehamwood, including postcodes WD6. Every project starts with a free home visit.
How much does a side extension cost in Borehamwood?
In Borehamwood, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £50,500–£78,500. Your fixed price depends on the survey and drawings.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.