SK Developments Free home visit0800 088 6248 Get a quote

LanarkshireSide extensions

Side extensions in Cambuslang

Our side extension service covers Cambuslang and the surrounding parts of Lanarkshire. Every project starts with a free visit and ends with a completion certificate.

Guide price in Cambuslang

£1,650–£2,550 per m² of floor area

In Cambuslang, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side extension?

Two-storey side extension in matching red brick on a semi-detached house with a block-paved drive

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.

How much does a side extension cost in Cambuslang?

In Cambuslang, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500. Building costs in Scotland are close to the UK average, so the figures for Cambuslang are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Cambuslang, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£33,000–£51,000
Typical project (28 m²)£46,000–£71,500
Larger project (39 m²)£64,500–£99,500
Rate per m²£1,650–£2,550

The biggest cost drivers are:

  • Internal fit-out of the new rooms
  • Single or two storeys
  • Boundary walls and access for materials
  • Drains, gas meters or soil pipes that need moving

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a side extension in Cambuslang?

The approval route for Cambuslang is set by planning law in Scotland. In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.

In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

What we take care of:

  • Planning drawings and application
  • Opening into the existing house
  • Structural calculations
  • Building control completion
  • Survey of the boundary, drains and access
  • Foundations and drainage alterations

How long does it take?

Expect 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in Cambuslang

In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.

Cambuslang sits in Lanarkshire, about 6 miles north-west of Hamilton. We cover the whole of Cambuslang, including postcodes G72.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about side extensions in Cambuslang

How long does it take?

Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.

Will I lose my driveway?

A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.

Do I need planning permission for a side extension in Cambuslang?

In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.

How much does a side extension cost in Cambuslang?

In Cambuslang, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £46,000–£71,500. Your fixed price depends on the survey and drawings.

Can a side extension go over a drain?

Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.

Do you build side extensions in Cambuslang?

Yes. We build side extensions across Cambuslang, including postcodes G72. Every project starts with a free home visit.

Get a free, no-obligation home visit for your side extension in Cambuslang.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price