What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Falmouth?
In Falmouth, a side extension typically costs £1,750–£2,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £49,000–£75,500. Prices in the South West sit near the national average for this kind of work, and the range for Falmouth reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £35,000–£54,000 |
| Typical project (28 m²) | £49,000–£75,500 |
| Larger project (39 m²) | £68,000–£105,500 |
| Rate per m² | £1,750–£2,700 |
What moves the price most:
- Boundary walls and access for materials
- Internal fit-out of the new rooms
- Steel work where the side wall is opened
- Roof design and tile matching
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side extension in Falmouth?
Approvals for a side extension in Falmouth follow the rules for England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical side extension we handle:
- Opening into the existing house
- Electrics, heating and plastering
- Foundations and drainage alterations
- Planning drawings and application
- Walls, roof and windows to match the house
- Structural calculations
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Falmouth
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Our Falmouth coverage includes postcode districts TR11, and we also work in nearby places such as Truro, Redruth and Camborne.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Falmouth
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
How much does a side extension cost in Falmouth?
In Falmouth, a side extension typically costs £1,750–£2,700 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £49,000–£75,500. Your fixed price depends on the survey and drawings.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How long does a side extension take in Falmouth?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
