What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Newquay?
In Newquay, a side extension typically costs £1,750–£2,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £49,000–£75,500. Building costs in the South West are close to the UK average, so the figures for Newquay are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £35,000–£54,000 |
| Typical project (28 m²) | £49,000–£75,500 |
| Larger project (39 m²) | £68,000–£105,500 |
| Rate per m² | £1,750–£2,700 |
The biggest cost drivers are:
- Roof design and tile matching
- Internal fit-out of the new rooms
- Steel work where the side wall is opened
- Boundary walls and access for materials
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side extension in Newquay?
Here is how the rules work for a side extension in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Building control completion
- Structural calculations
- Opening into the existing house
- Electrics, heating and plastering
- Walls, roof and windows to match the house
- Survey of the boundary, drains and access
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Newquay
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Newquay sits in Cornwall, about 10 miles north of Truro. We cover the whole of Newquay, including postcodes TR7.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Newquay
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
How much does a side extension cost in Newquay?
In Newquay, a side extension typically costs £1,750–£2,700 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £49,000–£75,500. Your fixed price depends on the survey and drawings.
How long does a side extension take in Newquay?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.