We take on side extensions in Mirfield, about 10 miles south-west of Leeds, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Mirfield

£1,600–£2,450 per m² of floor area

In Mirfield, a side extension typically costs £1,600–£2,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£68,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side extension?

Two-storey side extension in matching red brick on a semi-detached house with a block-paved drive

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.

How much does a side extension cost in Mirfield?

In Mirfield, a side extension typically costs £1,600–£2,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£68,500. We start from a UK-wide guide and adjust it for Yorkshire and the Humber, where labour and materials are typically about 7% below average. Design, structural calculations and council fees are extra.

Guide prices for Mirfield, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£32,000–£49,000
Typical project (28 m²)£45,000–£68,500
Larger project (39 m²)£62,500–£95,500
Rate per m²£1,600–£2,450

The main things that change the cost:

  • Steel work where the side wall is opened
  • Internal fit-out of the new rooms
  • Single or two storeys
  • Roof design and tile matching

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a side extension in Mirfield?

Before anything is built in Mirfield, we confirm which approvals apply in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

The work we manage on a side extension:

  • Structural calculations
  • Planning drawings and application
  • Survey of the boundary, drains and access
  • Walls, roof and windows to match the house
  • Foundations and drainage alterations
  • Building control completion

How long does it take?

Build time is typically 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in Mirfield

Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.

Our Mirfield coverage includes postcode districts WF14, and we also work in nearby places such as Liversedge, Dewsbury and Cleckheaton.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about side extensions in Mirfield

How long does a side extension take in Mirfield?

Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.

How much does a side extension cost in Mirfield?

In Mirfield, a side extension typically costs £1,600–£2,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£68,500. Your fixed price depends on the survey and drawings.

Will a two-storey side extension look odd?

Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.

Can I build a side extension without planning permission?

In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the original house, and the house is not in a conservation area or similar protected land. Two-storey side extensions always need planning permission.

Can a side extension go over a drain?

Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.

Start with a guide price, then book a free survey for a fixed quote in Mirfield.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price