What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Neath?
In Neath, a side extension typically costs £1,550–£2,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £43,500–£68,500. That range is adjusted for Wales, where domestic building work typically costs around 8% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £31,000–£49,000 |
| Typical project (28 m²) | £43,500–£68,500 |
| Larger project (39 m²) | £60,500–£95,500 |
| Rate per m² | £1,550–£2,450 |
Your quote will depend mainly on:
- Single or two storeys
- Boundary walls and access for materials
- Roof design and tile matching
- Internal fit-out of the new rooms
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side extension in Neath?
Whether you need planning permission depends on your house and its location in Wales. In Wales a single-storey side extension can be permitted development if it is no more than 4 metres high and the widest part of the house ends up no more than 50% wider than the original. Two-storey side extensions must be at least 10.5 metres from the side boundary and set back 1 metre from the front, so most need planning permission. In conservation areas single-storey side extensions are limited to 3 metres.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a side extension:
- Electrics, heating and plastering
- Building control completion
- Opening into the existing house
- Planning drawings and application
- Structural calculations
- Survey of the boundary, drains and access
How long does it take?
The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Neath
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Neath sits in West Glamorgan, about 7 miles north-east of Swansea. We cover the whole of Neath, including postcodes SA11.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Neath
How much does a side extension cost in Neath?
In Neath, a side extension typically costs £1,550–£2,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £43,500–£68,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a side extension in Neath?
In Wales a single-storey side extension can be permitted development if it is no more than 4 metres high and the widest part of the house ends up no more than 50% wider than the original. Two-storey side extensions must be at least 10.5 metres from the side boundary and set back 1 metre from the front, so most need planning permission. In conservation areas single-storey side extensions are limited to 3 metres.
How long does a side extension take in Neath?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.