What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Maesteg?
In Maesteg, a side extension typically costs £1,550–£2,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £43,500–£68,500. We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £31,000–£49,000 |
| Typical project (28 m²) | £43,500–£68,500 |
| Larger project (39 m²) | £60,500–£95,500 |
| Rate per m² | £1,550–£2,450 |
Your quote will depend mainly on:
- Boundary walls and access for materials
- Single or two storeys
- Drains, gas meters or soil pipes that need moving
- Steel work where the side wall is opened
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side extension in Maesteg?
The approval route for Maesteg is set by planning law in Wales. In Wales a single-storey side extension can be permitted development if it is no more than 4 metres high and the widest part of the house ends up no more than 50% wider than the original. Two-storey side extensions must be at least 10.5 metres from the side boundary and set back 1 metre from the front, so most need planning permission. In conservation areas single-storey side extensions are limited to 3 metres.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Walls, roof and windows to match the house
- Electrics, heating and plastering
- Survey of the boundary, drains and access
- Planning drawings and application
- Foundations and drainage alterations
- Structural calculations
How long does it take?
The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Maesteg
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
We work across Maesteg and neighbouring areas such as Neath, Bridgend and Tonypandy. Postcodes we cover in Maesteg include CF34.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Maesteg
How much does a side extension cost in Maesteg?
In Maesteg, a side extension typically costs £1,550–£2,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £43,500–£68,500. Your fixed price depends on the survey and drawings.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Do I need planning permission for a side extension in Maesteg?
In Wales a single-storey side extension can be permitted development if it is no more than 4 metres high and the widest part of the house ends up no more than 50% wider than the original. Two-storey side extensions must be at least 10.5 metres from the side boundary and set back 1 metre from the front, so most need planning permission. In conservation areas single-storey side extensions are limited to 3 metres.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Do you build side extensions in Maesteg?
Yes. We build side extensions across Maesteg, including postcodes CF34. Every project starts with a free home visit.