What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Romford?
In Romford, a side extension typically costs £2,200–£3,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £61,500–£96,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Romford. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £44,000–£69,000 |
| Typical project (28 m²) | £61,500–£96,500 |
| Larger project (39 m²) | £86,000–£134,500 |
| Rate per m² | £2,200–£3,450 |
What moves the price most:
- Boundary walls and access for materials
- Steel work where the side wall is opened
- Roof design and tile matching
- Single or two storeys
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Romford?
Here is how the rules work for a side extension in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most side extensions:
- Planning drawings and application
- Opening into the existing house
- Building control completion
- Walls, roof and windows to match the house
- Structural calculations
- Survey of the boundary, drains and access
How long does it take?
Expect 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Romford
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
From RM1 outwards, we take on projects throughout Romford and the surrounding parts of Greater London.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Romford
How much does a side extension cost in Romford?
In Romford, a side extension typically costs £2,200–£3,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £61,500–£96,500. Your fixed price depends on the survey and drawings.
How long does a side extension take in Romford?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
Can I build a side extension without planning permission?
In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the original house, and the house is not in a conservation area or similar protected land. Two-storey side extensions always need planning permission.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.