What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Seaham?
In Seaham, a side extension typically costs £1,550–£2,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £43,500–£67,000. The guide for Seaham reflects typical costs in the North East, roughly 10% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £31,000–£48,000 |
| Typical project (28 m²) | £43,500–£67,000 |
| Larger project (39 m²) | £60,500–£93,500 |
| Rate per m² | £1,550–£2,400 |
Your quote will depend mainly on:
- Single or two storeys
- Roof design and tile matching
- Drains, gas meters or soil pipes that need moving
- Boundary walls and access for materials
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side extension in Seaham?
Approvals for a side extension in Seaham follow the rules for England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a side extension:
- Walls, roof and windows to match the house
- Survey of the boundary, drains and access
- Planning drawings and application
- Foundations and drainage alterations
- Building control completion
- Electrics, heating and plastering
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Seaham
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
If your home is in Seaham or close by in Houghton-Le-Spring, Sunderland and Peterlee, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Seaham
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
How much does a side extension cost in Seaham?
In Seaham, a side extension typically costs £1,550–£2,400 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £43,500–£67,000. Your fixed price depends on the survey and drawings.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How long does a side extension take in Seaham?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
