What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Shoreham-by-Sea?
In Shoreham-by-Sea, a side extension typically costs £1,900–£2,950 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £53,000–£82,500. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £38,000–£59,000 |
| Typical project (28 m²) | £53,000–£82,500 |
| Larger project (39 m²) | £74,000–£115,000 |
| Rate per m² | £1,900–£2,950 |
Your quote will depend mainly on:
- Steel work where the side wall is opened
- Single or two storeys
- Internal fit-out of the new rooms
- Boundary walls and access for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Shoreham-by-Sea?
Before anything is built in Shoreham-by-Sea, we confirm which approvals apply in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical side extension we handle:
- Walls, roof and windows to match the house
- Planning drawings and application
- Foundations and drainage alterations
- Survey of the boundary, drains and access
- Building control completion
- Structural calculations
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Shoreham-by-Sea
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Our Shoreham-by-Sea coverage includes postcode districts BN43, and we also work in nearby places such as Lancing, Portslade and Worthing.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Shoreham-by-Sea
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How much does a side extension cost in Shoreham-by-Sea?
In Shoreham-by-Sea, a side extension typically costs £1,900–£2,950 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £53,000–£82,500. Your fixed price depends on the survey and drawings.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
How long does a side extension take in Shoreham-by-Sea?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.