What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Southall?
In Southall, a side extension typically costs £2,200–£3,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £61,500–£96,500. Building costs in London run about 30% above the UK average, and the figures for Southall are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £44,000–£69,000 |
| Typical project (28 m²) | £61,500–£96,500 |
| Larger project (39 m²) | £86,000–£134,500 |
| Rate per m² | £2,200–£3,450 |
The main things that change the cost:
- Single or two storeys
- Roof design and tile matching
- Internal fit-out of the new rooms
- Steel work where the side wall is opened
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Southall?
The approval route for Southall is set by planning law in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Foundations and drainage alterations
- Structural calculations
- Walls, roof and windows to match the house
- Planning drawings and application
- Survey of the boundary, drains and access
- Opening into the existing house
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Southall
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
We work across Southall and neighbouring areas such as Greenford, Ealing and Northolt. Postcodes we cover in Southall include UB1.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Southall
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How much does a side extension cost in Southall?
In Southall, a side extension typically costs £2,200–£3,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £61,500–£96,500. Your fixed price depends on the survey and drawings.
Who approves a side extension in Southall?
Planning matters in Southall go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.