Side extensions in Tayside

We take on side extensions throughout Tayside, including Dundee, Perth and Arbroath, with a free home visit and a fixed quote for the agreed specification.

Guide price in Tayside

£1,650–£2,550 per m² of floor area

In Tayside, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side extension?

Two-storey side extension in matching red brick on a semi-detached house with a block-paved drive

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.

How much does a side extension cost in Tayside?

In Tayside, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500. Prices in Scotland sit near the national average for this kind of work, and the range for Tayside reflects that. Design, structural calculations and council fees are extra.

Guide prices for Tayside, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£33,000–£51,000
Typical project (28 m²)£46,000–£71,500
Larger project (39 m²)£64,500–£99,500
Rate per m²£1,650–£2,550

The biggest cost drivers are:

  • Steel work where the side wall is opened
  • Single or two storeys
  • Roof design and tile matching
  • Boundary walls and access for materials

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a side extension in Tayside?

Whether you need planning permission depends on your house and its location in Scotland. In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.

In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

On a typical side extension we handle:

  • Survey of the boundary, drains and access
  • Planning drawings and application
  • Building control completion
  • Walls, roof and windows to match the house
  • Foundations and drainage alterations
  • Structural calculations

How long does it take?

Allow 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Tayside

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

Towns we cover in Tayside include Dundee, Perth, Arbroath, Forfar and Montrose.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about side extensions in Tayside

How long does it take?

Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.

Will I lose my driveway?

A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.

How much does a side extension cost in Tayside?

In Tayside, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £46,000–£71,500. Your fixed price depends on the survey and drawings.

Do I need planning permission for a side extension in Tayside?

In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.

Can a side extension go over a drain?

Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.

Do you build side extensions in Tayside?

Yes. We build side extensions across Tayside, including postcodes AB30, DD1, DD10, DD11 and DD2. Every project starts with a free home visit.

Ready to talk about a side extension in Tayside? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.