What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Dundee?
In Dundee, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500. Prices in Scotland sit near the national average for this kind of work, and the range for Dundee reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £33,000–£51,000 |
| Typical project (28 m²) | £46,000–£71,500 |
| Larger project (39 m²) | £64,500–£99,500 |
| Rate per m² | £1,650–£2,550 |
The main things that change the cost:
- Internal fit-out of the new rooms
- Single or two storeys
- Drains, gas meters or soil pipes that need moving
- Roof design and tile matching
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side extension in Dundee?
Here is how the rules work for a side extension in Scotland. In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most side extensions:
- Structural calculations
- Survey of the boundary, drains and access
- Foundations and drainage alterations
- Building control completion
- Walls, roof and windows to match the house
- Electrics, heating and plastering
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Dundee
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
We work across Dundee and neighbouring areas such as Cupar, St Andrews and Forfar. Postcodes we cover in Dundee include DD1.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Dundee
How much does a side extension cost in Dundee?
In Dundee, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £46,000–£71,500. Your fixed price depends on the survey and drawings.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Do I need planning permission for a side extension in Dundee?
In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
How long does a side extension take in Dundee?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.