What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Whitley Bay?
In Whitley Bay, a side extension typically costs £1,550–£2,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £43,500–£67,000. The guide for Whitley Bay reflects typical costs in the North East, roughly 10% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £31,000–£48,000 |
| Typical project (28 m²) | £43,500–£67,000 |
| Larger project (39 m²) | £60,500–£93,500 |
| Rate per m² | £1,550–£2,400 |
The biggest cost drivers are:
- Roof design and tile matching
- Internal fit-out of the new rooms
- Steel work where the side wall is opened
- Boundary walls and access for materials
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side extension in Whitley Bay?
Whether you need planning permission depends on your house and its location in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Survey of the boundary, drains and access
- Building control completion
- Electrics, heating and plastering
- Opening into the existing house
- Planning drawings and application
- Walls, roof and windows to match the house
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Whitley Bay
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
Our Whitley Bay coverage includes postcode districts NE26, and we also work in nearby places such as North Shields, Tynemouth and South Shields.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Whitley Bay
How much does a side extension cost in Whitley Bay?
In Whitley Bay, a side extension typically costs £1,550–£2,400 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £43,500–£67,000. Your fixed price depends on the survey and drawings.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Who approves a side extension in Whitley Bay?
Planning matters in Whitley Bay go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
