What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Bromley?
In Bromley, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £36,000–£51,500. Building costs in London run about 30% above the UK average, and the figures for Bromley are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £24,000–£34,500 |
| Typical project (12 m²) | £36,000–£51,500 |
| Larger project (17 m²) | £51,000–£73,000 |
| Rate per m² | £3,000–£4,300 |
Your quote will depend mainly on:
- Length of the side return
- Party wall surveyor fees
- Steel beams and propping of the back addition
- Access through the house for materials
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side return extension in Bromley?
Whether you need planning permission depends on your house and its location in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most side return extensions:
- Party wall advice and notices
- Drawings and planning or permitted development check
- Floor levelling, heating and electrics
- Glazed or solid roof with insulation
- Survey of party walls, drains and the existing back addition
- Steel beams to remove the side wall
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Bromley
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
From BR1 outwards, we take on projects throughout Bromley and the surrounding parts of Greater London.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Bromley
How much does a side return extension cost in Bromley?
In Bromley, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £36,000–£51,500. Your fixed price depends on the survey and drawings.
Will I need a party wall agreement?
Almost certainly in England and Wales, because side returns sit on or near the boundary. Notices must be served before work starts, and a party wall surveyor may be appointed if the neighbour does not consent.
Do you build side return extensions in Bromley?
Yes. We build side return extensions across Bromley, including postcodes BR1. Every project starts with a free home visit.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.