What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Bromley?
In Bromley, a wraparound extension typically costs £2,850–£4,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £80,000–£116,000. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £57,000–£83,000 |
| Typical project (28 m²) | £80,000–£116,000 |
| Larger project (39 m²) | £111,000–£162,000 |
| Rate per m² | £2,850–£4,150 |
Your quote will depend mainly on:
- Kitchen and flooring specification
- Total footprint and the amount of glazing
- Access for materials on terraced streets
- Steelwork and propping of the existing house
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a wraparound extension in Bromley?
Here is how the rules work for a wraparound extension in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most wraparound extensions:
- Design and planning application
- Structural engineer’s design for steels and supports
- Walls, roof and glazing
- Removal of internal and external walls
- Underfloor heating option, electrics and plastering
- Party wall notices and surveyor liaison
How long does it take?
Build time is typically 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Bromley
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
If your home is in Bromley or close by in Beckenham, Catford and Eltham, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Bromley
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
Do you build wraparound extensions in Bromley?
Yes. We build wraparound extensions across Bromley, including postcodes BR1. Every project starts with a free home visit.
How much does a wraparound extension cost in Bromley?
In Bromley, a wraparound extension typically costs £2,850–£4,150 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £80,000–£116,000. Your fixed price depends on the survey and drawings.