What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Derby?
In Derby, a side return extension typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £26,500–£38,000. That range is adjusted for the East Midlands, where domestic building work typically costs around 5% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £17,500–£25,000 |
| Typical project (12 m²) | £26,500–£38,000 |
| Larger project (17 m²) | £37,500–£53,500 |
| Rate per m² | £2,200–£3,150 |
The biggest cost drivers are:
- Party wall surveyor fees
- Access through the house for materials
- Steel beams and propping of the back addition
- Length of the side return
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Derby?
Before anything is built in Derby, we confirm which approvals apply in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a side return extension:
- Floor levelling, heating and electrics
- Steel beams to remove the side wall
- Survey of party walls, drains and the existing back addition
- Drawings and planning or permitted development check
- Building control sign-off
- Party wall advice and notices
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Derby
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
We work across Derby and neighbouring areas such as Belper, Ilkeston and Heanor. Postcodes we cover in Derby include DE1.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Derby
How much does a side return extension cost in Derby?
In Derby, a side return extension typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £26,500–£38,000. Your fixed price depends on the survey and drawings.
How long does a side return extension take in Derby?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.