What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Greenford?
In Greenford, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £36,000–£51,500. The guide for Greenford reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £24,000–£34,500 |
| Typical project (12 m²) | £36,000–£51,500 |
| Larger project (17 m²) | £51,000–£73,000 |
| Rate per m² | £3,000–£4,300 |
What moves the price most:
- Length of the side return
- Glazed roof specification
- Access through the house for materials
- Steel beams and propping of the back addition
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Greenford?
Before anything is built in Greenford, we confirm which approvals apply in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a side return extension:
- Glazed or solid roof with insulation
- Party wall advice and notices
- Building control sign-off
- Survey of party walls, drains and the existing back addition
- Drawings and planning or permitted development check
- Steel beams to remove the side wall
How long does it take?
Allow 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Greenford
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
We work across Greenford and neighbouring areas such as Northolt, Southall and Ealing. Postcodes we cover in Greenford include UB6.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side return extensions in Greenford
Does a side return extension need planning permission?
It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.
How much does a side return extension cost in Greenford?
In Greenford, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £36,000–£51,500. Your fixed price depends on the survey and drawings.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
How long does a side return extension take in Greenford?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.