Greater LondonStructural alterations and knock-throughs

Structural alterations and knock-throughs in Greenford

We take on structural alterations in Greenford, about 10 miles west of central London, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Greenford

£5,750–£12,500 for a typical knock-through with steel beam

In Greenford, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Greenford?

In Greenford, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.

Guide prices for Greenford, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£5,750–£12,500
Higher specification£12,500–£15,500

Your quote will depend mainly on:

  • Flush or downstand beam
  • Moving radiators, sockets and pipes
  • Party wall involvement
  • What sits above the wall

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a structural alteration in Greenford?

Before anything is built in Greenford, we confirm which approvals apply in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

On a typical structural alteration we handle:

  • Party wall notices where needed
  • Building control application
  • Making good, plastering and flooring repairs
  • Steel beam supply and installation on padstones
  • Structural engineer’s calculations and drawings
  • Temporary propping

How long does it take?

Allow 1 to 2 weeks on site for a typical knock-through. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in Greenford

Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.

Projects in Greenford (UB6) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about structural alterations in Greenford

Do I need building regulations approval?

Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.

Do I need a party wall notice?

In England and Wales, if the beam sits in a party wall, yes.

How long does a knock-through take?

Usually 1 to 2 weeks on site, plus a few days for plastering to dry.

Who approves a structural alteration in Greenford?

Planning matters in Greenford go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

How much does a structural alteration cost in Greenford?

In Greenford, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Start with a guide price, then book a free survey for a fixed quote in Greenford.

Call 0800 088 6248 or get an instant guide price online.