What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Hawarden?
In Hawarden, a side return extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £25,000–£36,500. We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £17,000–£24,500 |
| Typical project (12 m²) | £25,000–£36,500 |
| Larger project (17 m²) | £35,500–£52,000 |
| Rate per m² | £2,100–£3,050 |
What moves the price most:
- Glazed roof specification
- Party wall surveyor fees
- Steel beams and propping of the back addition
- Access through the house for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Hawarden?
Before anything is built in Hawarden, we confirm which approvals apply in Wales. In Wales a side return infill is treated as a single-storey side extension: it can be permitted development within the 4 metre height and 50% width limits, but many terraced streets are in conservation areas or have removed rights. Party wall notices are usually needed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Survey of party walls, drains and the existing back addition
- Foundations and drainage, including any build-over agreement
- Floor levelling, heating and electrics
- Drawings and planning or permitted development check
- Glazed or solid roof with insulation
- Party wall advice and notices
How long does it take?
Build time is typically 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Hawarden
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
From CH5 outwards, we take on projects throughout Hawarden and the surrounding parts of Clwyd.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side return extensions in Hawarden
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
Do you build side return extensions in Hawarden?
Yes. We build side return extensions across Hawarden, including postcodes CH5. Every project starts with a free home visit.
How much does a side return extension cost in Hawarden?
In Hawarden, a side return extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £25,000–£36,500. Your fixed price depends on the survey and drawings.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Do I need planning permission for a side return extension in Hawarden?
In Wales a side return infill is treated as a single-storey side extension: it can be permitted development within the 4 metre height and 50% width limits, but many terraced streets are in conservation areas or have removed rights. Party wall notices are usually needed.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
