What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Hawarden?
In Hawarden, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £277,500–£442,500. Prices across Wales are typically 8% below the UK average for this kind of work, which is reflected in the range for Hawarden. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £194,000–£310,000 |
| Typical project (150 m²) | £277,500–£442,500 |
| Larger project (210 m²) | £388,500–£619,500 |
| Rate per m² | £1,850–£2,950 |
Your quote will depend mainly on:
- External works and landscaping
- Specification and energy systems
- Ground conditions and foundations
- Size and complexity of the house
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Hawarden?
Before anything is built in Hawarden, we confirm which approvals apply in Wales. In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Structural and services design
- Mechanical and electrical installation
- Internal fit-out and finishes
- Groundworks, foundations and drainage
- Design and planning application
- Superstructure, roof and windows
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Hawarden
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
From CH5 outwards, we take on projects throughout Hawarden and the surrounding parts of Clwyd.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Hawarden
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How much does a new build home cost in Hawarden?
In Hawarden, a new build home typically costs £1,850–£2,950 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £277,500–£442,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a new build home in Hawarden?
In Wales a new home needs full planning permission. Welsh building regulations require automatic fire suppression (sprinklers) in new homes, and sustainable drainage approval from the council’s SuDS approval body is needed for most new buildings.
How long does a new build home take in Hawarden?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
