What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Putney?
In Putney, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £36,000–£51,500. Building costs in London run about 30% above the UK average, and the figures for Putney are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £24,000–£34,500 |
| Typical project (12 m²) | £36,000–£51,500 |
| Larger project (17 m²) | £51,000–£73,000 |
| Rate per m² | £3,000–£4,300 |
What moves the price most:
- Length of the side return
- Moving drains and soil stacks
- Access through the house for materials
- Steel beams and propping of the back addition
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side return extension in Putney?
Approvals for a side return extension in Putney follow the rules for England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a side return extension:
- Floor levelling, heating and electrics
- Party wall advice and notices
- Building control sign-off
- Survey of party walls, drains and the existing back addition
- Foundations and drainage, including any build-over agreement
- Steel beams to remove the side wall
How long does it take?
Build time is typically 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Putney
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
From SW15 outwards, we take on projects throughout Putney and the surrounding parts of Greater London.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Putney
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How much does a side return extension cost in Putney?
In Putney, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £36,000–£51,500. Your fixed price depends on the survey and drawings.
How long does a side return extension take in Putney?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.