What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Westhill?
In Westhill, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £27,000–£38,500. Building costs in Scotland are close to the UK average, so the figures for Westhill are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £18,000–£25,500 |
| Typical project (12 m²) | £27,000–£38,500 |
| Larger project (17 m²) | £38,000–£54,500 |
| Rate per m² | £2,250–£3,200 |
Your quote will depend mainly on:
- Steel beams and propping of the back addition
- Agreements with neighbours on shared walls
- Glazed roof specification
- Access through the house for materials
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side return extension in Westhill?
The approval route for Westhill is set by planning law in Scotland. In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Drawings and planning or permitted development check
- Floor levelling, heating and electrics
- Written agreement with neighbours on shared walls
- Foundations and drainage, including any build-over agreement
- Glazed or solid roof with insulation
- Steel beams to remove the side wall
How long does it take?
Allow 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Westhill
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
If your home is in Westhill or close by in Aberdeen, Inverurie and Stonehaven, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Westhill
Do I need planning permission for a side return extension in Westhill?
In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
How much does a side return extension cost in Westhill?
In Westhill, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £27,000–£38,500. Your fixed price depends on the survey and drawings.
How long does a side return extension take in Westhill?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
