If you live in Welling and need more space, a side return extension may be the answer. We survey the house, prepare the design and build it, with a fixed price for the agreed specification.

Guide price in Welling

£3,000–£4,300 per m² of floor area

In Welling, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £36,000–£51,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side return extension?

Kitchen-diner in a Victorian terrace with a long sloping glass roof along the side return

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.

How much does a side return extension cost in Welling?

In Welling, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £36,000–£51,500. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.

Guide prices for Welling, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (8 m²)£24,000–£34,500
Typical project (12 m²)£36,000–£51,500
Larger project (17 m²)£51,000–£73,000
Rate per m²£3,000–£4,300

The main things that change the cost:

  • Party wall surveyor fees
  • Glazed roof specification
  • Access through the house for materials
  • Steel beams and propping of the back addition

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a side return extension in Welling?

Approvals for a side return extension in Welling follow the rules for England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

On a typical side return extension we handle:

  • Drawings and planning or permitted development check
  • Glazed or solid roof with insulation
  • Foundations and drainage, including any build-over agreement
  • Floor levelling, heating and electrics
  • Steel beams to remove the side wall
  • Building control sign-off

How long does it take?

Build time is typically 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Welling

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

We work across Welling and neighbouring areas such as Bexleyheath, Sidcup and Eltham. Postcodes we cover in Welling include DA16.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about side return extensions in Welling

How long does a side return extension take in Welling?

Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.

Does a side return extension need planning permission?

It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.

How much does a side return extension cost in Welling?

In Welling, a side return extension typically costs £3,000–£4,300 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £36,000–£51,500. Your fixed price depends on the survey and drawings.

How much space does a side return add?

Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.

Can I stay in the house?

Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.

Ready to talk about a side return extension in Welling? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.