What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Yeovil?
In Yeovil, a side return extension typically costs £2,350–£3,350 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £28,000–£40,000. Prices in the South West sit near the national average for this kind of work, and the range for Yeovil reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £19,000–£27,000 |
| Typical project (12 m²) | £28,000–£40,000 |
| Larger project (17 m²) | £40,000–£57,000 |
| Rate per m² | £2,350–£3,350 |
What moves the price most:
- Glazed roof specification
- Moving drains and soil stacks
- Party wall surveyor fees
- Length of the side return
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Yeovil?
Whether you need planning permission depends on your house and its location in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a side return extension:
- Floor levelling, heating and electrics
- Drawings and planning or permitted development check
- Party wall advice and notices
- Glazed or solid roof with insulation
- Survey of party walls, drains and the existing back addition
- Building control sign-off
How long does it take?
Build time is typically 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Yeovil
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Yeovil sits in Somerset, about 21 miles east of Taunton. We cover the whole of Yeovil, including postcodes BA20.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side return extensions in Yeovil
How much does a side return extension cost in Yeovil?
In Yeovil, a side return extension typically costs £2,350–£3,350 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £28,000–£40,000. Your fixed price depends on the survey and drawings.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Will I need a party wall agreement?
Almost certainly in England and Wales, because side returns sit on or near the boundary. Notices must be served before work starts, and a party wall surveyor may be appointed if the neighbour does not consent.
How long does a side return extension take in Yeovil?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.