A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Yeovil?
In Yeovil, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £307,500–£487,500. Building costs in the South West are close to the UK average, so the figures for Yeovil are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £215,000–£341,000 |
| Typical project (150 m²) | £307,500–£487,500 |
| Larger project (210 m²) | £430,500–£682,500 |
| Rate per m² | £2,050–£3,250 |
Your quote will depend mainly on:
- Site access and demolition
- Services connections
- Size and complexity of the house
- External works and landscaping
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a new build home in Yeovil?
Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most new build homes:
- Design and planning application
- Structural and services design
- Site appraisal and feasibility
- Internal fit-out and finishes
- Mechanical and electrical installation
- Groundworks, foundations and drainage
How long does it take?
Build time is typically 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Yeovil
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
We work across Yeovil and neighbouring areas such as Mendip, Bridgwater and Taunton. Postcodes we cover in Yeovil include BA20.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Yeovil
How much does a new build home cost in Yeovil?
In Yeovil, a new build home typically costs £2,050–£3,250 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £307,500–£487,500. Your fixed price depends on the survey and drawings.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
Who approves a new build home in Yeovil?
Planning matters in Yeovil go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is Community Infrastructure Levy payable?
In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.