What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Basingstoke?
In Basingstoke, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £44,000–£65,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £31,000–£45,500 |
| Typical project (20 m²) | £44,000–£65,000 |
| Larger project (28 m²) | £61,500–£91,000 |
| Rate per m² | £2,200–£3,250 |
Your quote will depend mainly on:
- Ground conditions and foundation depth
- How much of the existing house is opened up
- Roof type and the size of any lantern or roof windows
- Glazing: sliding and bifold doors cost more than French doors
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Basingstoke?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Knock-through to the existing house with steel beams
- Structural calculations for steels and lintels
- Doors, windows and roof glazing installed
- Foundations, drainage and any build-over agreement
- First and second fix electrics, heating and plastering
- Measured survey and design drawings
How long does it take?
Build time is typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Basingstoke
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Projects in Basingstoke (RG21) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Basingstoke
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How long does a single-storey extension take in Basingstoke?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
How much does a single-storey extension cost in Basingstoke?
In Basingstoke, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £44,000–£65,000. Your fixed price depends on the survey and drawings.