What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Newburn?
In Newburn, a single-storey extension typically costs £1,750–£2,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £35,000–£52,000. The guide for Newburn reflects typical costs in the North East, roughly 10% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £24,500–£36,500 |
| Typical project (20 m²) | £35,000–£52,000 |
| Larger project (28 m²) | £49,000–£73,000 |
| Rate per m² | £1,750–£2,600 |
The biggest cost drivers are:
- How much of the existing house is opened up
- Roof type and the size of any lantern or roof windows
- Ground conditions and foundation depth
- Glazing: sliding and bifold doors cost more than French doors
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a single-storey extension in Newburn?
Here is how the rules work for a single-storey extension in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most single-storey extensions:
- First and second fix electrics, heating and plastering
- Foundations, drainage and any build-over agreement
- Structural calculations for steels and lintels
- Cavity walls, insulation and roof to current building regulations
- Doors, windows and roof glazing installed
- Knock-through to the existing house with steel beams
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Newburn
The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.
Our Newburn coverage includes postcode districts NE15, and we also work in nearby places such as Newcastle upon Tyne, Gateshead and Wallsend.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Newburn
How much does a single-storey extension cost in Newburn?
In Newburn, a single-storey extension typically costs £1,750–£2,600 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £35,000–£52,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
How long does a single-storey extension take in Newburn?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.